Web Site Cover Picture 567

1st March 2016

coverpic567.jpg - 76Kb

Making Connections
Simon Casterton has the muddy job of connecting drainage pipes in the trench outside the Showroom. We are upgrading the surface drainage system from the roads at the back of the main building which, over recent years, has formed a path to the front door of Signal Cottage. Three new road gullies were installed in November but the wet weather halted progress on the pipework until now. However the weather has decided to be wet again so the digging of trenches with a steady flow of water along them has been challenging.

Previous / Thumbnail Group / Next